Work  /   Our Projects   /  Construction Management

South Oak Park Blvd Rehabilitation

Grover Beach

Wallace Group provided construction management, inspection, and testing services for the project which included pavement rehabilitation of South Oak Park Boulevard in the City of Grover Beach between Grand Ave to Mentone Ave. The work included over 16,000 square yards of full depth reclamation – cement (FDR-C) and over 3,000 tons of hot mix asphalt, which also included new concrete curb ramps, adjusting existing utilities, and thermoplastic striping. A large part of what contributed to the project’s success was that traffic was maintained at all times with a single lane in each direction and impacts significantly reduced by implementing a detailed work staging plan.

Client

City of Grover Beach

Services Provided

Construction Management
Bg dark

Want to work with us?

Get in touch
Bg projects

Want to make our communities better?

4fd8b2af48b65b3cb139e52790fc452f Ec89c2fdfc0cff61185f173ae4bbd183 5d4514ab591831926b73d888cebb1565 2dda63642c8ee02fc03e6c1ee6ae7f5f